Completed Projects List

Project Country Client Client’s Contact Project Duration/ Completion Scope of Supply
1 110kV Xuan Mai S/S Vietnam Toprank Corporation Sdn Bhd Ir.Vincent Chew 2002 Engineering & testing
2 110kV Hong Ha S/S Vietnam Toprank Corporation Sdn Bhd Ir.Vincent Chew 2002 Engineering & testing
3 33kV Mega Steel S/S (extension) Malaysia Cobrain Holdings Sdn Bhd Mr.Charles Liew, Project Manager 2003 Engineering, panels & testing
4 132kV Sri Sulong S/S (panel retrofitting) Malaysia Bras Ventures Sdn Bhd Tan Sri Barry Goh 2004 Engineering & site rectification
5 132kV Bakri S/S (panel retrofitting) Malaysia Bras Ventures Sdn Bhd Tan Sri Barry Goh 2004 Engineering & site rectification
6 275/132kV Gebeng Industry S/S (panel retrofitting) Malaysia Bras Ventures Sdn Bhd Tan Sri Barry Goh 2004 Engineering & site rectification
7 132kV Seberang Jaya S/S Malaysia Bras Ventures Sdn Bhd Tan Sri Barry Goh 2004-2006 Engineering & panels
8 132kV Seberang Jaya S/S (relay retrofitting) Malaysia Terachi Electrical Services Sdn Bhd Ir.Sahruddin, MD 2006 Engineering
9 132kV Parit Sulong S/S (relay retrofitting) Malaysia Terachi Electrical Services Sdn Bhd Ir.Sahruddin, MD 2006 Engineering & site rectification
10 132kV Seremban S/S (relay retrofitting) Malaysia Terachi Electrical Services Sdn Bhd Ir.Sahruddin, MD 2006 Engineering & site rectification
11 132kV Salak Tinggi S/S (relay retrofitting) Malaysia Areva (M) Sdn Bhd Mr.Lee WC, Project Engineer 2006-2007 Engineering & site rectification
12 132kV Nilai S/S (relay retrofitting) Malaysia Areva (M) Sdn Bhd Mr.Lee WC, Project Engineer 2006-2007 Engineering & site rectification
13 132kV Kota Bharu S/S (relay retrofitting) Malaysia Terachi Electrical Services Sdn Bhd Ir.Sahruddin, MD 2006 Engineering
14 PMU Bkt Tarek 275kV, Selangor Malaysia AMBC Controls Sdn Bhd Ir.Mazelan 2007 Engineering
15 PMU Panchor & PPU Central 132/33kV, Kedah Malaysia Terachi Electrical Services Sdn Bhd Ir.Sahruddin, MD 2007 Engineering
16 33/11kV Arc Protection Panel (6 substations) Malaysia Vamp (M) Sdn Bhd Mr.Ganesan Arumugan 2007 Engineering & panels
17 PMU/PPU Mersing/Tanjung Gemuk 33kV, Johor Malaysia Transgrid Ventures Sdn Bhd Ir.Abu Azam Bin Yaacob 2007-2008 Engineering, material & site retrofitting
18 PMU Aman Jaya, Bedong, Asia Jaya, Sg Petani Industri 132kV, Kedah Malaysia Terachi Electrical Services Sdn Bhd Ir.Sahruddin, Managing Director 2008-2009 Engineering
19 132kV Fanchugong Substation Bangladesh LKE Electric (M) Sdn Bhd Dr.Soh / Deric Lim 2008-2009 Supply of switchboard & engineering
20 PMU Bukit Merah 275/132kV Autotransformer Bay Malaysia Toprank Corporation Sdn Bhd Ir.Vincent Chew 2007-2009 Consultancy
21 PMU Bukit Merah 275/132kV Autotransformer Bay Malaysia Toprank Corporation Sdn Bhd Ir.Vincent Chew 2007-2009 Engineering & panel retrofitting
22 PMU Kuala Ketil 132/11kV S/S (RTCC panel retrofitting) Malaysia Terachi Electrical Services Sdn Bhd Ir.Sahruddin, MD 2008 Engineering
23 PMU 275kV Kenyir S/S (relay retrofitting) Malaysia LR Heavy Engineering & Construction Sdn Bhd Mr.Rakesh 2008 Engineering, material & site  retrofitting
24 PMU Larkin, Perling & Tampoi SCDC 132kV, Johor Bahru Malaysia Matrix Power Services Sdn Bhd Ir.Haizad Huzaini 2008-2009 Engineering, material & site  retrofitting
25 Kapar Power Plant, Kapar, Selangor Malaysia Bumi Teknikal Solution Sdn Bhd Khairani Bt Othman 2008 Supply, erection, testing & commissioning of DCDB switchboard
26 PMU Lukut 132kV, Seremban Malaysia ETD Transmission & Distribution Sdn Bhd Ir.Lim KJ 2008-2009 Material, engineering & site retrofitting
27 PMU Arab Malaysia Industri 132kV, Seremban Malaysia Transgrid Ventures Sdn Bhd En.Mohd Ali 2008 Live upgrade of 415VAC/110VDC switchboard at site
28 PMU Jalan Imbi 132kV, KL Malaysia ETD Transmission & Distribution Sdn Bhd Ir.Lim KJ 2008-2009 Material, engineering & site services
29 PMU Gebeng 132kV, Kuantan Malaysia ETD Transmission & Distribution Sdn Bhd Ir.Lim KJ 2009 Material, engineering & site services
30 PMU Jalan Imbi 132kV, KL Malaysia SM Muhibbah Heavy Eng & Construction Sdn Bhd Mr. Yogesvaran Kutty 2009 Supply of switchboard & engineering
31 PMU Gebeng Industri 132kV, Kuantan Malaysia SM Muhibbah Heavy Eng & Construction Sdn Bhd Mr. Yogesvaran Kutty 2009 Supply of switchboard & engineering
32 PMU Shah Alam West 132kV, Selangor Malaysia ABB (M) Sdn Bhd Mr.Lau Kin Fatt 2009 Supply of cable, erection, testing
33 PMU KL North/Jalan Pantai 275kV, PMU Vistion City/Jalan Imbi 132kV, KL Malaysia ABB (M) Sdn Bhd Mr.Lau Kin Fatt 2009 Supply of cable, erection, testing
34 PMU Kampung Lanjut 132kV, KL Malaysia ABB (M) Sdn Bhd Mr.Lim Cho Yan 2009-2010 Supply of cable, erection, testing
35 Ann Joo Steel Plant 132kV Substation Malaysia ABB (M) Sdn Bhd Mr.Lau Kin Fatt 2009-2010 Supply of cable, erection, testing & commissioning
36 PMU Balakong/Bandar Tun Razak 132kV, KL Malaysia Duta Technic Sdn Bhd En.Masli 2010 Material, engineering & site services
37 PMU Tebrau 132/33kV, Johor Bahru Malaysia Mahkota Technologies Sdn Bhd Mr.SV Ganes 2010 Supply of cable & erection of switchboard & engineering
38 132kV Bheramara Substation Bangladesh LKE Electric (M) Sdn Bhd Dr.Soh / Deric Lim 2010 Supply of switchboard & engineering
39 PMU Permas Jaya/Tebrau 132kV, Johor Bahru Malaysia Zafas Sdn Bhd Ir.Elvin Sim 2010-2011 Engineering & site retrofitting of capacitor bank
40 PMU Malim Jaya 132kV, Melaka Malaysia Toshiba Transmission & Distributation Systems Asia Sdn Bhd Ir. Vincent Chew 2011 Supply of materials
41 PMU Pantai Remis 132kV, Perak Malaysia ABB (M) Sdn Bhd Mr.Lau Kin Fatt 2011 Supply of cable & erection of switchboard
42 PMU Ayer Keroh 132kV, Melaka Malaysia SM Muhibbah Heavy Eng & Construction Sdn Bhd Mr. Yogesvaran Kutty 2011 Material, engineering & site services
43 PMU Tebrau/Kota Tinggi/Ulu Tiram 132kV, Johor Bahru Malaysia LR Heavy Engineering & Construction Sdn Bhd Mr.Rakesh 2009-2011 Material, engineering & site services
44 PMU Malim Jaya 132kV, Melaka Malaysia Toshiba Transmission & Distributation Systems Asia Sdn Bhd Ir.Vincent Chew 2010-2011 Engineering design & consultancy
45 PMU Yong Peng South 132kV, Johor Malaysia SM Muhibbah Heavy Eng & Construction Sdn Bhd Mr. Yogesvaran Kutty 2011 Material, engineering & site services
46 PMU Pengkalan 132kV, Perak
KTM 2-phase Systems OHL Feeder
Malaysia SM Muhibbah Heavy Eng & Construction Sdn Bhd Mr. Yogesvaran Kutty 2011 Switchboard, engineering & site support
47 PMU Gurun 132kV, Kedah
KTM 2-phase Systems OHL Feeder
Malaysia SM Muhibbah Heavy Eng & Construction Sdn Bhd Mr. Yogesvaran Kutty 2011 Switchboard, engineering & site support
48 PMU Penampang / Tuaran 132/66/33/11kV RTCC, Sabah East Malaysia Penulaju Sdn Bhd Mr.Wong Foo Tuong 2011 RTCC, engineering & site support
49 PMU Bkt Kepong, Segamat, Chaah, Bkt Siput & Yong Peng North 132kV, Johor Malaysia Pembinaan Tajri Sdn Bhd En.Kamarulzaman 2011 Dec Supply of engineering, material, cable & site retrofitting of switchboard
50 Changing 275kV Interposing VT for Power Plant (Paka, Kapar, Kuala Langat, Perlis, Powertek, Pasir Gudang, Segari) Malaysia Pembinaan Tajri Sdn Bhd En.Kamarulzaman 2011 – 2012 Supply of engineering, material, cable & site retrofitting of switchboard
51 PMU Junjong 275kV, Kedah Malaysia ABB (M) Sdn Bhd Mr.Lau Kin Fatt 2011 Dec – 2012 System conversion of SCS to RTU
52 PMU Ayer Keroh, Ujung Pasir 132kV, Melaka Malaysia Zafas Sdn Bhd Ir. Elvin Sim 2012 Supply of engineering, material, cable & site retrofitting of switchboard
53 PMU Pasir Gudang 275kV, Johor Bahru Malaysia ABB (M) Sdn Bhd Mr.Lau Kin Fatt 2011 Dec – 2012 System conversion of SCS to RTU
54 PMU UTM-Skudai, Saleng, Senai 132kV T-Off Malaysia Pembinaan Tajri Sdn Bhd En.Harun Gaffur 2012 Supply, engineering & site installation of CRP
55 PMU Yong Peng North 132kV, Johor Malaysia SM Muhibbah Heavy Eng & Construction Sdn Bhd Mr. Yogesvaran Kutty Apr – Jul, 2012 Supply, engineering & site retrofitting of 275/11kV reactor
56 R&R Phase 3, Mainhead A Relay Retrofitting, Northern regions (275kV & 132kV, 7 substations, 20 bays, double busbar to 1 1/2 CB systems) Malaysia Zafas Sdn Bhd Ir. Elvin Sim Jan 2012 – Dec 2012 Supply, engineering & site installation
57 PMU Chendering, Kuala Berang, Kuala Terengganu & Kenyir, 132kV (LILO) Malaysia Toshiba Transmission & Distributation Systems Asia Sdn Bhd Ir.Vincent Chew  Mar 2012 – Dec 2012 Supply, engineering & site installation & retrofitting
58 PMU Bahau, 45MVA Reactor Malaysia Pembinaan Tajri Sdn Bhd Ir. Elvin Sim Jan 2013 – May 2013 Control & Relay Panels
59 PMU Kuala Krai, 132kV Malaysia Toshiba Transmission & Distributation Systems Asia Sdn Bhd Ir.Vincent Chew 2012 – Aug 2013 Supply, engineering & site installation & retrofitting
60 PMU Pajam, Negeri Sembilan, 132kV Malaysia Toshiba Transmission & Distributation Systems Asia Sdn Bhd Ir.Vincent Chew 2013 – 2014 System conversion of SCS to RTU
61 PMU Chuping 132kV, Kedah Malaysia Zafas Sdn Bhd Mr.Lim Thin Teck 2012 – 2014 CRP retrofitting for 50MVAR reactor
62 PMU Aman Jaya 132kV OHL Malaysia Toshiba Transmission & Distributation Systems Asia Sdn Bhd Ir.Vincent Chew 2013 – 2014 Contro & Relay retrofitting works
63 PMU Sri Damansara & Harta Kemuncak, 132kV Malaysia Transmission Technology Sdn Bhd (associate com of MRCB) En.Shukor 2013 – 2014 Contro & Relay panel & retrofitting works
64 PMU Connaught Bridge 275kV Generator Bay Extension Malaysia Toshiba Transmission & Distributation Systems Asia Sdn Bhd Ir.Vincent Chew 2013 – 2015 Total contract on extending a new 275kV Generator bay
65 132kV TPSS Railway Substation, Selangor Malaysia Express Rail Link Sdn Bhd (Subsiriary of YTL Corp) Mr.Jayaraj Savarimuthu 2014 Erection, retrofitting & testin of control/relay panels
66 132kV Kangkar Tebrau, 4 x OHL bay Malaysia Pembinaan Terasmaju Sdn Bhd Mr.Saravanan 2014 – 2015 Contro & Relay retrofitting works
67 275/132kV PMU BTBN/PRGS/SKSP upgrading works for NPRI Malaysia Hasilwan (M) Sdn Bhd Mr.Yong Sien Wae 2014 – 2015 Contro & Relay retrofitting works
68 Sangatta 72.5kV Substation, Balikpapan Indonesia General Electric (M) Sdn Bhd En.Mazli Yahya 2013 – 2015 Contro & Relay Panels
69 PMU Pork Klang, 275kV OHL Malaysia Toshiba Transmission & Distributation Systems Asia Sdn Bhd Ir.Vincent Chew 2013 – 2015 Contro & Relay retrofitting works
70 Perak Balance Work for PMU Bkt Merah, Ayer Tawar, Batu Gajah & Segari Malaysia Hasilwan (M) Sdn Bhd Mr.Yong Sien Wae 2014 – 2015 Erection of primary equipment and retrofitting on control/relay panels/ RTU
71 PMU 132kV Bkt Tengah Rehabilitation Works Malaysia Pembinaan Bukit Cheeding Sdn Bhd Mr.Ng 2015 Control & protection retrofitting works
72 132kV NKST & PROT Low Impedance Busbar Protection Malaysia Hasilwan (M) Sdn Bhd Mr.Yong Sien Wae 2014 – 2015 New Low Impedance Busbar protection system to existing substation